Thank you for your patience while we retrieve your images.
Uploaded 18-Mar-14
Taken 8-Feb-14
Visitors 20


91 of 231 photos
Thumbnails
Info
Categories & Keywords

Category:
Subcategory:
Subcategory Detail:
Keywords:Panama
Photo Info

Dimensions5390 x 3712
Original file size2.28 MB
Image typeJPEG
Color spacesRGB
Date taken8-Feb-14 17:39
Date modified18-Mar-14 22:39
Shooting Conditions

Camera makeCanon
Camera modelCanon EOS 5D Mark III
Focal length200 mm
Max lens aperturef/2.8
Exposure1/1000 at f/7.1
FlashNot fired
Exposure bias+1/3 EV
Exposure modeAuto
Exposure prog.Aperture priority
ISO speedISO 320
Metering modePattern

New lock doors awaiting installation in the Canal expansion projects. The new doors will be sliding rather than hinged. The Panama Canal expansion project includes the construction of a third lane of locks alongside the existing locks. Three different levels will be constructed -- one behind the other -- rising ships from sea level to Lake Gatun at 85 feet above sea level. The locks are 60% wider and 40% longer than the existing ones, and each has three chambers. Double doors are being installed between the different levels to meet the stringent reliability requirements. The doors must be capable of withstanding hugely fluctuating water pressures, ship collisions and earthquakes.